For Heritage Locomotives running on the Mainline OTMR (On-Train-data recording Equipment) is now a requirement. Work to fit OTMR on D1015 Started on 4th January 2006 and was finished on 30th July 2006. The time taken to do the work included the planning of the electrical Conduit run, the fabricating and installing of said run under the B End cab floor and corridor into the preheater compartment the running of cables in conduit, the fitting of the equipment in the cab and the black box under the preheater and the terminating of the wires both ends and static testing of the equipment.
|
|
Here Steve
Wainwright is seen installing the OTMR under 'B' End preheater.
|
|
Photo
of the newly installed OTMR Equipment.
|
|