8th August 2010

Clayton D8568 ventured out on a test run Saturday 7th August, the loco was only on No 2 engine as the recently fitted No1 is still to be fully connected & commissioned. The Test run was not completely successfully as the recently fitted turbo failed on the second run for reasons that are not yet fully understood, however we will be exchanging that turbo for the known good one from the, now spare original No 1 engine.

Below all Photos taken of D8568 on 7th August 2010 : Courtesy of Dave Hird.

  

 

 

 

  

 

  

 

Below all Photos taken of D8568 on 7th August 2010 : Courtesy of Chris Hatton.

  

 

 

 

  

 

  

 

9th July 2010

Clayton D8568 has had its No.1 power unit installed at Chinnor after the overhauled generator was mated with a replacement engine which was a former BR engine previously in use as a standby generator, there is still a lot of work to do before it can be used in anger as the engine has seen a fair number of modifications since it was last used in a loco probably 35 or more years ago!

Photos: Courtesy of Chris Hatton.

  

 Below: Power unit is lifted into the Clayton at Chinnor.

 

 Below : Paxman engine lifted into d8568.

 

15th April 2010

D8568 is currently being repainted at Chinnor and will be attending Wolverton Works Open Weekend 14th/15th August.

 

13th October 2009

The number two engine on the Clayton was started and ran for an hour or so today and all seems well. The Paxman supplied head joints obtained a few months ago appear to be working without any problem.

22nd September 2009

The replacement engine that has been coupled to the rewound main generator in recent months at OOC was delivered to Chinnor last Tuesday. Chris Guntripp is currently cleaning & painting the engine room area prior to it being fitted into the loco. The No 2 engine has had 4 out of the 6 cylinder heads rejointed with the joints obtained from MAN (Paxman) a couple of months ago......2 more to do!
The loco has recently had a 'new' set of batteries fitted which enabled quite an easy start up a couple of weeks ago despite approx 5 years since it last ran.

7th May 2009

Chris Hatton started one end of the Clayton up on 2nd May for the first time in a number of years. After fitting a overhauled blower and the replacement engine and overhauled generator  the other End has been re-united ready for fitting .