D1015 TRANSMISSION REPAIRS OLD OAK COMMON - 2004.
|
|
||||||||
|
EUR68,000.00 worth of nice new shiny bits ready to fit! |
||||||||
|
Photo courtesy of DTG/Voith Turbo |
|
|
||||||||
|
The transmission being tested simulating train loads. The testing involved operating the transmission to the normal engine output............ then adding a further 50 BHP input for good measure! The Voith Engineer behind is Herr. Villiams! Photo courtesy of DTG/Voith Turbo |
||||||||
|
|
||||||
|
Turbine from inside the transmission ready for inspection. |
||||||
|
Photo courtesy of DTG/Voith Turbo |
|
|
|
D1015 awaits the return of its transmission inside the fGW Heavy Maintenance Facility at Old Oak Common. 23/10/04 |
|
|
|
D1015 stands outside the fGW Heavy Maintenance Facility at Old Oak Common. 24/10/04 |